Welding and Cutting for Boilermakers

Cutting and welding as boilermakers use them, followed through a spring season with Ironbridge Industrial out of Port Allen, Louisiana: oxyfuel track cuts on a tank shell, plasma membrane splits and mechanical tube cutting, air carbon arc back-gouging, SMAW on plate in all positions and FCAW in the field, tube end preparation and fit-up, GTAW and SMAW boiler tube welds and membrane walls, window and pad welds, preheat and PWHT for carbon and chromium-molybdenum tubes under ASME and NBIC repair rules, and weld quality, NDE and repair, ending with a capstone that replaces a section of waterwall tube from repair package to hydrostatic test.

BLR-210 12 lessons · 3 h 52 min ▶ Video lessons coming soon

Offered by HSM University · Boilermaking

This is the American version of this course. See the Canadian version.

What you'll learn

  • Describe the cutting and welding processes boilermakers use, where each fits, and how pressure welding is regulated through procedures, welder qualification, continuity and inspection
  • Prepare equipment that has held product for hot work and make oxyfuel track cuts, bevels and attachment removals on vessels and tanks, planning the gas and the acetylene withdrawal rate
  • Split membrane bars with plasma and cut boiler tubes mechanically, plugging and recording tube ends and freeing a section before the final square cuts
  • Back-gouge double-V joints and excavate defects with air carbon arc gouging and grinding, confirming sound metal by examination
  • Weld plate in the flat, horizontal, vertical and overhead positions with low-hydrogen electrodes and check heat input against the WPS
  • Choose between SMAW, gas-shielded FCAW and self-shielded FCAW in the field, and control wind, stickout and fume
  • Prepare tube ends with end prep machines, clean them, cut a replacement section to length and check root opening and high-low at fit-up
  • Describe how boiler tube butt welds are made from the GTAW root to the SMAW cap in fixed positions, and how membrane walls are closed
  • Plan tube replacements, window welds and pad welds, and assemble a repair package for inspector acceptance
  • Select preheat, interpass and PWHT from the base metal group and thickness, confirm alloys by PMI, and describe field heat treatment and Grade 91 controls
  • Recognize weld discontinuities, match them to the NDE methods that find them, apply acceptance rules and carry out a weld repair
  • Carry a waterwall tube section replacement from repair package to signed record, including examination, repair and the hydrostatic test

Course content

12 lessons · 3 h 52 min total · final exam

  1. 1 Welding and cutting in boilermaker work 21 min · quiz
  2. 2 Oxyfuel cutting on vessels and in the field 19 min · quiz
  3. 3 Plasma cutting and tube cutting tools 20 min · quiz
  4. 4 Air carbon arc gouging and back-gouging 20 min · quiz
  5. 5 SMAW on plate in all positions 19 min · quiz
  6. 6 FCAW in the field 19 min · quiz
  7. 7 Tube end preparation and fit-up 19 min · quiz
  8. 8 Boiler tube welding and membrane walls 19 min · quiz
  9. 9 Pad welds, window welds and tube replacements 19 min · quiz
  10. 10 Welding on pressure parts: procedures, preheat and PWHT 19 min · quiz
  11. 11 Weld quality, NDE and repair 19 min · quiz
  12. 12 Capstone: replacing a section of waterwall tube 19 min · quiz
  13. E Final exam 20 questions

Requirements

Recommended background. You can start any course at any time.

Description

Cutting and welding as boilermakers use them, followed through a spring season with Ironbridge Industrial out of Port Allen, Louisiana: oxyfuel track cuts on a tank shell, plasma membrane splits and mechanical tube cutting, air carbon arc back-gouging, SMAW on plate in all positions and FCAW in the field, tube end preparation and fit-up, GTAW and SMAW boiler tube welds and membrane walls, window and pad welds, preheat and PWHT for carbon and chromium-molybdenum tubes under ASME and NBIC repair rules, and weld quality, NDE and repair, ending with a capstone that replaces a section of waterwall tube from repair package to hydrostatic test.