Cooling and Airflow

Operating, inspecting and troubleshooting data center cooling, followed through a technician's cooling term at Stonebridge Data's campus in Ashburn, Virginia: heat and its units, humidity and dew point, the ASHRAE thermal guidelines, CRAC and CRAH units, chillers, cooling towers and free cooling, raised floors and containment, rear-door and in-row cooling, direct-to-chip cooling and CDUs, immersion and heat reuse, cooling monitoring and alarms, and a night of incidents in a liquid-cooled AI hall.

DCT-230 12 lessons · 4 h ▶ Video lessons coming soon

Offered by HSM University · Data Center Operations

This is the American version of this course. See the Canadian version.

What you'll learn

  • Explain why all IT power becomes heat and convert heat loads between kilowatts, BTU/h and tons
  • Read dry-bulb temperature, relative humidity, dew point and wet-bulb temperature and explain what each says about the hall
  • Apply the ASHRAE thermal guidelines at the equipment inlet and investigate inlet temperature complaints
  • Identify the parts of CRAC and CRAH units, read their controls, carry out monthly checks and check redundancy before maintenance
  • Describe how chillers, dry coolers, cooling towers and economizers reject heat and recognize plant problems from the halls
  • Manage raised-floor air delivery: tile placement, leaks, obstructions and floor pressure
  • Keep hot- and cold-aisle containment tight and measure recirculation and bypass from temperatures
  • Inspect rear-door heat exchangers and in-row units and respond to leak alarms
  • Explain direct-to-chip cooling, the two coolant loops and the CDU, and trend CDU approach temperatures
  • Compare immersion cooling with other methods and describe how data center heat can be reused
  • Interpret cooling sensors and alarms, check whether readings are real and respond at the right level
  • Diagnose cooling problems in a liquid-cooled hall by comparing units and loops, and write a clear incident record

Course content

12 lessons · 4 h total · final exam

  1. 1 Heat in the data center 23 min · quiz
  2. 2 Air, temperature, humidity and dew point 19 min · quiz
  3. 3 ASHRAE thermal guidelines and inlet temperature 21 min · quiz
  4. 4 CRAC and CRAH units 21 min · quiz
  5. 5 Chillers, cooling towers and economizers 19 min · quiz
  6. 6 Raised floors, perforated tiles and air delivery 19 min · quiz
  7. 7 Hot and cold aisle containment and airflow management 20 min · quiz
  8. 8 Liquid cooling: rear-door heat exchangers and in-row units 19 min · quiz
  9. 9 Direct-to-chip cooling and coolant distribution units 19 min · quiz
  10. 10 Immersion cooling and heat reuse 21 min · quiz
  11. 11 Monitoring temperature, humidity, pressure and leaks 19 min · quiz
  12. 12 Capstone: tracking down a hot spot and a CDU alarm in Hall D 20 min · quiz
  13. E Final exam 20 questions

Requirements

Recommended background. You can start any course at any time.

Description

Operating, inspecting and troubleshooting data center cooling, followed through a technician's cooling term at Stonebridge Data's campus in Ashburn, Virginia: heat and its units, humidity and dew point, the ASHRAE thermal guidelines, CRAC and CRAH units, chillers, cooling towers and free cooling, raised floors and containment, rear-door and in-row cooling, direct-to-chip cooling and CDUs, immersion and heat reuse, cooling monitoring and alarms, and a night of incidents in a liquid-cooled AI hall.