HSE-230 · Lesson 4 of 4 · 9 min

Leading the pre-job talk

Keep it to five or ten minutes. Walk through the task steps, the main hazards and the controls. Make sure everyone signs the FLHA and knows they can stop work.

If conditions change during the job (new equipment, weather, a different task), stop and update the FLHA.