Hoistway Construction and Rail Installation
How elevators are installed in a new hoistway, followed through the rail stage of a 30-storey Vancouver tower: the installation sequence and the Technical Safety BC permit, reading layout drawings, surveying the hoistway as built, wire and laser plumbing, T-section guide rails and fishplates, bracket spacing and anchorage in concrete and steel, stacking and aligning car and counterweight rails, building compression and sliding clips, buffers and pit equipment, counterweight frames and fillers, the car sling and platform, machine-room-less machine spaces, construction elevators and jump lifts, and a capstone installation checklist, with WorkSafeBC fall protection, silica and overhead safety throughout.
ELV-120 12 lessons · 3 h 39 min ▶ Video lessons coming soon
Offered by HSM University · Elevators
This is the Canadian version of this course. See the American version.
What you'll learn
- Describe the installation sequence for a traction elevator, the division of work with the general contractor, and the Technical Safety BC permit and WorkSafeBC requirements that frame it
- Read elevator layout drawings, including the plan view, elevation, details and reactions, and check that the parts of a layout fit the clear hoistway
- Survey a hoistway from reference lines and benchmarks, find the tight floor, and report out-of-tolerance conditions
- Set templates and wire or laser plumb lines, choose the line positions to balance clearances, and keep the lines accurate and protected
- Identify T-section guide rails by designation and nominal weight, explain rail joints and fishplates, and receive, store and handle rails correctly
- Lay out rail brackets to the layout's maximum spacing, fasten them to concrete and steel with the specified anchors, and check an anchor's share of load
- Stack, align and gauge car and counterweight rails, check and dress joints, and allow for building compression with sliding clips and a top gap
- Explain the types and purpose of buffers, calculate oil buffer stroke from speed, and install buffers and pit equipment to the layout runbys
- Build and fill a counterweight frame safely, calculate the filler count, and square and plumb a car sling and platform to the rails
- Describe machine rooms and machine-room-less machine spaces, calculate the static loads at the top of an MRL hoistway, and set an MRL machine
- Explain the rules for construction elevators and how a jump lift climbs with a building, and plan jumps from the concrete schedule
- Prepare and run a rail installation checklist with hold points, record corrections, and compare crew-hours with the estimate
Course content
12 lessons · 3 h 39 min total · final exam
- 1 Installation sequence and the mechanic's role 19 min · quiz
- 2 Reading elevator layout drawings 18 min · quiz
- 3 Hoistway survey and as-built checks 18 min · quiz
- 4 Plumbing the hoistway 18 min · quiz
- 5 Guide rail types and materials 18 min · quiz
- 6 Rail bracket layout and anchorage 18 min · quiz
- 7 Setting and aligning car and counterweight rails 18 min · quiz
- 8 Buffers and pit equipment 18 min · quiz
- 9 Counterweight frame and fillers; first look at the car sling 18 min · quiz
- 10 Machine spaces and setting machine-room-less equipment 18 min · quiz
- 11 Jump lifts and temporary construction elevators 18 min · quiz
- 12 Capstone: the rail installation checklist for Quayside car 2 20 min · quiz
- E Final exam 20 questions
Requirements
Recommended background. You can start any course at any time.
Description
How elevators are installed in a new hoistway, followed through the rail stage of a 30-storey Vancouver tower: the installation sequence and the Technical Safety BC permit, reading layout drawings, surveying the hoistway as built, wire and laser plumbing, T-section guide rails and fishplates, bracket spacing and anchorage in concrete and steel, stacking and aligning car and counterweight rails, building compression and sliding clips, buffers and pit equipment, counterweight frames and fillers, the car sling and platform, machine-room-less machine spaces, construction elevators and jump lifts, and a capstone installation checklist, with WorkSafeBC fall protection, silica and overhead safety throughout.