Chillers and Large Systems
Chillers and central plants for HVAC-R technicians, followed through a fourth-year apprentice servicing a hospital plant in Kitchener: chiller types and AHRI ratings with IPLV; centrifugal compressors, surge, variable-speed drives, low-pressure refrigerants, purge units and CSA B52 machinery rooms; absorption and heat-recovery chillers; cooling towers, condenser water reset and free cooling; water treatment; primary-secondary and variable primary piping and low delta-T; pumps, balancing and glycol; plant sequencing; logs and approaches; tube cleaning, eddy current testing and leak management under Ontario and federal rules; and a plant improvement study.
RAC-410 12 lessons · 3 h 26 min ▶ Video lessons coming soon
Offered by HSM University · Refrigeration and Air Conditioning
This is the Canadian version of this course. See the American version.
What you'll learn
- Describe how a central chilled-water plant works, convert between COP, EER and kW/ton, and estimate annual cooling, equivalent full-load hours and plant energy from load data
- Compare scroll, screw, centrifugal and absorption chillers and air-cooled and water-cooled designs, and use AHRI 550/590 rating conditions and IPLV to compare chillers' part-load performance
- Explain centrifugal compressor operation, lift and surge, capacity control by inlet vanes and variable speed, low-pressure refrigerants and purge units, and machinery room safety under CSA B52
- Explain the absorption cycle and its care, and evaluate heat-recovery chillers by cooling, heating and combined COP for hospitals and campuses
- Calculate cooling tower range, approach, heat rejection and water use, apply condenser water reset and waterside economizers, and protect towers in winter
- Interpret water treatment programs for open and closed loops, including cycles of concentration, blowdown, scaling tendency, biological control and closed-loop makeup
- Analyse constant-flow, primary-secondary and variable primary chilled-water systems, and diagnose and correct low delta-T syndrome
- Apply pump and system curves and the affinity laws, set differential pressure control, balance hydronic systems and correct for glycol
- Describe chiller start and stop sequences, staging, chilled-water and condenser water reset and plant optimization, and choose the best staging order for unlike chillers
- Start up and operate large chillers, keep and read logs, and use evaporator and condenser approaches to detect problems early
- Plan chiller maintenance, including tube cleaning, eddy current testing, oil analysis, electrical and safety tests, and manage refrigerant leaks and records under Ontario and federal rules
- Carry out a plant improvement study that measures a baseline, estimates and ranks measures, accounts for interactive effects, carbon and risk, and presents clear recommendations
Course content
12 lessons · 3 h 26 min total · final exam
- 1 Large systems and central plants 17 min · quiz
- 2 Chiller types and ratings 17 min · quiz
- 3 Centrifugal chillers in depth 19 min · quiz
- 4 Absorption and heat-recovery chillers 17 min · quiz
- 5 Cooling towers and condenser water systems 17 min · quiz
- 6 Water treatment for open and closed loops 17 min · quiz
- 7 Chilled-water piping arrangements 17 min · quiz
- 8 Pumps and hydronic balancing 17 min · quiz
- 9 Chiller plant controls and sequencing 16 min · quiz
- 10 Start-up, operation and daily logs 17 min · quiz
- 11 Chiller maintenance and leak management 18 min · quiz
- 12 Plant optimization: the capstone retrofit study 17 min · quiz
- E Final exam 20 questions
Requirements
Recommended background. You can start any course at any time.
Description
Chillers and central plants for HVAC-R technicians, followed through a fourth-year apprentice servicing a hospital plant in Kitchener: chiller types and AHRI ratings with IPLV; centrifugal compressors, surge, variable-speed drives, low-pressure refrigerants, purge units and CSA B52 machinery rooms; absorption and heat-recovery chillers; cooling towers, condenser water reset and free cooling; water treatment; primary-secondary and variable primary piping and low delta-T; pumps, balancing and glycol; plant sequencing; logs and approaches; tube cleaning, eddy current testing and leak management under Ontario and federal rules; and a plant improvement study.