CON-220 · Lesson 11 of 12 · 26 min
Negligence, professional liability, warranties and limitation periods
Construction liability does not end when the contract is complete. A roof that leaks after five years, a parking garage slab that spalls after ten, an engineer's error that causes a collapse, a subcontractor's faulty work discovered by a buyer who never had a contract with it: all raise questions of liability outside or after the contract. This lesson covers the law of negligence as it applies to builders and designers, the liability of design professionals, the owner's warranty of the design it furnishes, express and implied warranties, indemnities, and the time limits within which claims must be brought.
Negligence
Negligence is the main tort in construction. A person is liable in negligence if they owed the claimant a duty of care, breached the standard of care, and caused damage that is not too remote. Negligence claims matter in construction because they can be brought by people who have no contract with the defendant: an owner against a subcontractor, a later purchaser against the original builder, a contractor against the owner's engineer, or an injured member of the public against everyone involved.
The modern law of negligence descends from cases such as MacPherson v. Buick Motor Co. (1916) in New York and the English case Donoghue v. Stevenson (1932), which extended a manufacturer's duty of care to the ultimate user of its product. Each state decides the scope of duty under its own case law, usually considering foreseeability of harm, the relationship between the parties and policy factors.
The standard of care is that of a reasonable person in the defendant's position. For contractors, it is the care a reasonably competent contractor would exercise; for professionals, the care of a reasonably competent member of the profession. Compliance with the building code is evidence of reasonable care but not conclusive, and breach of the code is evidence of negligence.
Pure economic loss
The difficult cases in construction involve pure economic loss: financial loss that is not the result of physical injury to a person or damage to other property. The cost of repairing a defective wall, or the profit lost because a building opened late, is pure economic loss. Courts are cautious about allowing such losses in negligence, because contracts are the normal way to allocate them.
Most states apply an economic loss rule, which bars recovery in tort for purely economic losses between parties who could have allocated those losses by contract, leaving them to their contract remedies. States differ widely on how far the rule reaches: some apply it strictly to bar homeowners' negligence claims against builders for defects, others allow such claims or allow claims against design professionals by contractors who relied on their work. Some states recognize an exception for defects that pose a risk of physical harm, and most allow claims for damage to other property.
| Type of loss | Example | Usual position |
|---|---|---|
| Personal injury | A worker is hurt by a falling object | Recoverable in negligence |
| Damage to other property | A leaking pipe ruins the tenant's stock | Recoverable in negligence |
| Dangerous defect, before injury | Cladding at risk of falling | Varies by state |
| Shoddy but safe defect | Poor finishes, inefficient system | Usually only in contract |
| Delay and lost profit | Late opening | Usually only in contract |
Liability of design professionals
Architects and engineers owe duties in contract to their clients, and in tort to those who foreseeably rely on their work. Their standard of care is that of a reasonably competent professional practicing at the time; they do not guarantee perfect designs, but they must design in accordance with accepted practice and the applicable codes, review shop drawings with reasonable care, and administer the contract fairly when acting as payment certifier or interpreter.
Many states allow contractors to sue design professionals in negligence or negligent misrepresentation for economic losses caused by defective plans on which they relied, while others bar such claims under the economic loss rule and leave contractors to claim against the owner. On federal and many state projects, the contractor's main remedy for design defects is against the owner, under the Spearin doctrine.
The owner, in turn, has a contract claim against its designers. Design professionals usually carry professional liability insurance, and their contracts often limit liability to their fee or to the insurance limits; some states restrict such limitations. State licensing boards can also discipline architects and engineers.
The Spearin doctrine
In United States v. Spearin (1918), the government's specifications required a contractor to relocate a sewer, which later burst because of a dam the plans did not show. The Supreme Court held that when the owner furnishes detailed plans and specifications, it impliedly warrants that a contractor following them will produce a satisfactory result, and the contractor is not responsible for consequences of defects in them. Spearin is followed in federal contracting and most states. It applies to design (detailed) specifications, not to performance specifications that leave the method to the contractor. Contractors still have a duty to notice and report patent defects, and contract clauses can limit Spearin in some states.
Worked problem
Design specification or performance specification?
Specification A says: 'Install 200 mm insulated precast panels with the reinforcing, anchors and joint details shown on drawings S-301 to S-310.' Specification B says: 'Provide a curtain wall system designed by the contractor's engineer to resist the wind loads and drift stated in Section 08 44 13.' Panels built to A crack under wind load; the curtain wall built to B leaks. Who bears the design risk in each?
Show solution
- A is a detailed design specification: the owner, through its designer, generally bears the risk of the design if the contractor built as shown.
- B is a performance specification with delegated design: the contractor bears the risk that its engineered system meets the stated performance.
- In both cases the contractor remains responsible for workmanship and for reporting obvious design errors.
Answer: A: owner's design risk; B: contractor's design risk.
Warranties and correction periods
Construction contracts contain express warranties that the work will conform to the contract documents and be free from defects. They usually add a correction period, commonly one year from substantial completion, during which the contractor must return and correct defects that appear.
A201-2017 § 3.5 contains the contractor's warranty that materials and equipment are new and of good quality and the work conforms to the contract documents. § 12.2.2 sets a one-year correction period from substantial completion during which the contractor must correct nonconforming work after notice. The correction period is not a limit on the contractor's liability; the owner can still sue within the statute of limitations. Implied warranties also apply: the warranty of workmanlike construction and, in most states, an implied warranty of habitability for new homes sold by builders.
Indemnities
An indemnity is a promise to compensate another party for losses, usually third-party claims, arising from specified events. Construction contracts are full of indemnities: the contractor indemnifies the owner against claims arising from its work, subcontractors indemnify the contractor. Broad-form indemnities that require a party to indemnify another even for the other's own negligence are controversial.
Most states have anti-indemnity statutes that void clauses requiring a party to indemnify another for the other's sole negligence, and some void indemnity for the other's partial negligence. Courts interpret indemnities strictly and require clear words to cover the indemnitee's own negligence.
Limitation periods
Claims must be started within time limits set by statute. Missing the limitation period ends the claim, regardless of its merit.
Each state sets statutes of limitation for contract and tort claims, typically three to six years for written contracts and two to three years for negligence, often running from discovery of the defect. States also have statutes of repose for construction, which bar claims a fixed number of years after substantial completion, whether or not the defect has been discovered. California, for example, sets 10 years for latent defects; Texas generally 10 years; Florida reduced its period to 7 years in 2023. Lien and bond claims have their own much shorter periods.
Worked problem
Calculating limitation deadlines
A commercial building reached substantial completion on June 15, 2020. Water staining appeared in 2024, and an engineering report delivered on March 10, 2025 identified defective roof membrane work. Assume a state with a 4-year limitation period from discovery for construction defects and a 10-year statute of repose from substantial completion. When must suit be filed?
Show solution
- Limitation: 4 years from discovery, at the latest March 10, 2029 (earlier if discovery is found in 2024).
- Repose: 10 years from June 15, 2020, so June 15, 2030.
- The earlier deadline, the limitation period, controls.
- Prudent target: file well before four years from the first staining in 2024.
Answer: By March 10, 2029 at the latest, and earlier to be safe.
Insurance and defect claims
Defect claims are usually paid, if at all, by insurance. Contractors carry commercial general liability insurance, which generally covers property damage and bodily injury caused by an occurrence, but not the cost of repairing the contractor's own defective work. Whether damage to other parts of a project caused by a subcontractor's faulty work is covered depends on the policy wording and on court decisions that differ between jurisdictions. Design professionals carry professional liability insurance written on a claims-made basis, which covers claims made while the policy is in force. Owners often require project-specific policies, such as wrap-up liability or builder's risk insurance, to simplify claims. CON-350 covers insurance and bonding in detail.
For the construction manager, the practical points are to report potential claims to insurers promptly, because late notice can defeat coverage; to keep the records needed to show what caused damage and when; and to read the insurance requirements in the contract before signing, because they decide who carries which risks long after the project is finished.
Practical protection against long-tail claims
Because defect claims can arrive many years after completion, contractors and designers should keep project records, including as-built drawings, inspection and test reports, submittals, photographs and correspondence, for at least as long as the longest limitation or repose period that could apply. Records that seem routine at closeout, such as a field report showing that a membrane was inspected before it was covered, can decide a claim a decade later. Companies should also track which entity performed each project, because claims follow the legal entity, not the brand, and corporate reorganizations can complicate who is responsible.
Common mistakes
MistakeAssuming liability ends when the one-year warranty period expires.
InsteadContract and negligence claims continue within the limitation period.
MistakeBuilding an obviously defective design without comment.
InsteadReport patent design errors in writing; the duty to warn applies.
MistakeWaiting for a full expert report before considering limitation periods.
InsteadLimitation periods may run from earlier discovery; diarize from the first sign of a problem.
MistakeAssuming an indemnity covers the indemnitee's own negligence.
InsteadOnly clear words do, and anti-indemnity statutes may void it.
MistakeTreating performance and design specifications alike.
InsteadIdentify who designed each element; design risk follows design responsibility.
Summary and key terms
- Negligence requires a duty of care, breach of the standard of care, causation and damage that is not too remote.
- Each state defines duty under its own case law.
- The economic loss rule usually limits defect claims to contract, with state-by-state variation.
- Under Spearin, owners impliedly warrant the adequacy of detailed design specifications.
- Warranty and correction periods do not limit liability for defects within the limitation period.
- Indemnities are read strictly; broad-form indemnities may be void by statute.
- Statutes of limitation run from discovery; statutes of repose run from completion.
- Negligence
- Failure to take reasonable care, causing foreseeable harm to someone owed a duty.
- Duty of care
- A legal obligation to take reasonable care to avoid harming another.
- Standard of care
- The level of care expected of a reasonable person or professional.
- Pure economic loss
- Financial loss without physical injury or damage to other property.
- Negligent misrepresentation
- A careless statement relied on by someone the maker owed a duty to.
- Design specification
- A specification that tells the contractor exactly how to build.
- Performance specification
- A specification that states the required result and leaves design to the contractor.
- Correction period
- The time after completion during which the contractor must correct defects.
- Indemnity
- A promise to compensate another for specified losses.
- Statute of repose
- A fixed time limit running from completion, regardless of discovery.
Practice problems
Work each problem on paper first, then reveal the answer to check.
Name the four elements of negligence.
Show answer
Duty, breach, causation and damage that is not too remote.
What did Spearin decide?
Show answer
An owner furnishing detailed plans impliedly warrants their adequacy.
Is a poor-quality but safe finish usually recoverable in negligence?
Show answer
No; it is usually a contract matter.
Does the economic loss rule apply the same way in every state?
Show answer
No; states differ widely.
Does the one-year correction period limit liability?
Show answer
No; claims can be brought within the limitation period.
Who bears design risk under a performance specification?
Show answer
The contractor.
Defect discovered May 1, 2026; 2-year period. Deadline?
Show answer
May 1, 2028.
What does a broad-form indemnity do?
Show answer
Requires indemnity even for the other party's own negligence.
What is a statute of repose?
Show answer
A fixed limit from completion regardless of discovery.
What should a contractor do with an obvious design error?
Show answer
Report it in writing before building it.
Lesson quiz · 5 questions
Score 60% or more to complete this lesson.