Sign in or create a free account to continue.

Construction Management Capstone

A complete construction management plan for one building, followed through a contractor's capstone team pursuing a two-part municipal fire station in Nova Scotia under CCDC 2 2020: project selection and the bid or no-bid decision; scope statement and work breakdown structure; delivery method, contract terms, subcontract packages and long-lead procurement; quantity takeoff; estimate and bid with levelled subtrade quotes, general conditions and markups; a CPM schedule with float, critical path and time contingency; control budget, cash flow with holdback and earned value; site logistics by phase; a project-specific safety plan; quality, commissioning and closeout; a risk register with Monte Carlo contingency; and the final report and presentation.

CON-499 Year 4 3 credits 12 lessons · 4 h 11 min

Offered by HSM University · Construction Management

This is the Canadian version of this course. See the American version.

What you'll learn

  • Select a suitable capstone project, make a reasoned bid or no-bid assessment and organize a team with a written charter, roles and standards.
  • Write a scope statement, a responsibility table for items that cross between parties and a work breakdown structure that satisfies the 100 % rule.
  • Explain the owner's choice of delivery method, review the contract's key commercial terms and plan subcontract packages, prequalification and long-lead procurement.
  • Prepare a quantity takeoff with stated units, conventions and waste factors, and check it with ratios, independent measurement and subtrade quantities.
  • Build a complete estimate and bid from loaded labour rates, general conditions, levelled subtrade quotes, contingency and markups, and check it against benchmarks.
  • Develop a CPM schedule with defensible durations and logic, calculate float and the critical path, and write a basis of schedule with visible time contingency.
  • Turn the estimate into a control budget and cost-loaded schedule, model cash flow with holdback, and plan cost control using earned value.
  • Prepare phase-by-phase site logistics plans covering access, deliveries, cranes, temporary services, neighbours, erosion control and winter work.
  • Write a project-specific site safety plan that identifies serious hazards, applies the hierarchy of controls and manages subtrades, emergencies and leading indicators.
  • Plan quality, commissioning and closeout, including an inspection and test plan, mock-ups, integrated systems testing, training and handover.
  • Build a risk register with contract allocation, responses and owners, and set cost and time contingencies using quantitative analysis such as Monte Carlo simulation.
  • Produce a consistent final report with an executive summary and clear figures, and deliver and defend a rehearsed presentation of the plan.

Course content

12 lessons · 4 h 11 min total · final exam

  1. 1 The capstone brief and choosing your project 21 min · quiz
  2. 2 Scope, work breakdown structure and constraints 23 min · quiz
  3. 3 Delivery method, procurement and contract strategy 20 min · quiz
  4. 4 Quantity takeoff for the capstone building 20 min · quiz
  5. 5 The estimate and the bid 20 min · quiz
  6. 6 The CPM schedule 23 min · quiz
  7. 7 Cash flow, budget and cost control plan 20 min · quiz
  8. 8 Site logistics plan 20 min · quiz
  9. 9 Site safety plan 20 min · quiz
  10. 10 Quality, commissioning and closeout plan 21 min · quiz
  11. 11 Risk register and contingency 23 min · quiz
  12. 12 The final report and presentation 20 min · quiz
  13. E Final exam 20 questions

Requirements

Recommended background. You can start any course at any time.

Description

A complete construction management plan for one building, followed through a contractor's capstone team pursuing a two-part municipal fire station in Nova Scotia under CCDC 2 2020: project selection and the bid or no-bid decision; scope statement and work breakdown structure; delivery method, contract terms, subcontract packages and long-lead procurement; quantity takeoff; estimate and bid with levelled subtrade quotes, general conditions and markups; a CPM schedule with float, critical path and time contingency; control budget, cash flow with holdback and earned value; site logistics by phase; a project-specific safety plan; quality, commissioning and closeout; a risk register with Monte Carlo contingency; and the final report and presentation.

Part of the Construction Management stream, typically taken in year 4.