Quality Control, Inspection and Testing

Planning and proving quality on a building: quality as conformance to the contract documents, quality assurance and control, the cost of quality, quality management systems and the project quality plan, inspection and test plans with hold and witness points, submittals, preinstallation meetings and mock-ups, three-phase control and first-work inspections, concrete, reinforcing and post-tensioning testing under CSA A23.1, soils, steel, masonry and fireproofing testing, envelope, roof and air leakage testing, field reviews and letters of assurance under the BC Building Code, nonconformances and corrective action, deficiencies, substantial performance and warranties under CCDC 2, and quality metrics and culture, following one wood-frame mid-rise from podium to handover.

CON-345 Year 3 3 credits 12 lessons · 4 h 42 min

Offered by HSM University · Construction Management

This is the Canadian version of this course. See the American version.

What you'll learn

  • Define quality as conformance to the contract documents, distinguish quality assurance from quality control and grade from quality, and explain the quality roles of the owner, consultants, testing agency, authority and contractor.
  • Prepare a project quality plan from a company quality management system and the specifications, including a requirements register, a coverage check and a risk ranking of activities.
  • Write inspection and test plans with measurable acceptance criteria and hold, witness, review and surveillance points, and schedule them in the look-ahead with their notice periods.
  • Use submittals, preinstallation meetings and mock-ups, including field water testing, to prevent defects before work is repeated.
  • Apply three-phase control and first-work inspections, and adjust follow-up sampling according to inspection results.
  • Inspect and test concrete, reinforcing and post-tensioning and apply CSA A23.1 strength acceptance criteria, required average strength and the investigation of low results.
  • Plan and interpret compaction, bolting, welding, masonry and sprayed fireproofing tests and coordinate the testing agency.
  • Inspect envelope control layers before cover and interpret window water tests, roof and deck tests and multipoint air leakage tests.
  • Work with the authority having jurisdiction and registered professionals, track field reviews and open items, and prepare for letters of assurance at completion.
  • Manage nonconformances through control, disposition, correction, verification, root cause analysis, corrective action and back-charges.
  • Manage deficiencies progressively to closure, explain substantial performance under the BC Builders Lien Act and CCDC 2, and describe warranty and latent defect obligations.
  • Measure quality with paired measures, control charts and sampling plans, build a quality culture with the trades, and prepare a quality plan for a new project from lessons learned.

Course content

12 lessons · 4 h 42 min total · final exam

  1. 1 Quality in construction 23 min · quiz
  2. 2 Quality management systems and the project quality plan 25 min · quiz
  3. 3 Inspection and test plans 24 min · quiz
  4. 4 Submittals, preinstallation meetings and mock-ups 24 min · quiz
  5. 5 First-work inspections and three-phase control 24 min · quiz
  6. 6 Concrete and reinforcing testing in Canada 25 min · quiz
  7. 7 Soils, steel, masonry and fireproofing testing in Canada 23 min · quiz
  8. 8 Envelope, air barrier and water testing 23 min · quiz
  9. 9 Field reviews, inspections and letters of assurance 22 min · quiz
  10. 10 Nonconformances and corrective action 23 min · quiz
  11. 11 Deficiencies, punch lists and warranties in Canada 22 min · quiz
  12. 12 Capstone: quality metrics, culture and a quality plan 24 min · quiz
  13. E Final exam 20 questions

Requirements

Recommended background. You can start any course at any time.

Description

Planning and proving quality on a building: quality as conformance to the contract documents, quality assurance and control, the cost of quality, quality management systems and the project quality plan, inspection and test plans with hold and witness points, submittals, preinstallation meetings and mock-ups, three-phase control and first-work inspections, concrete, reinforcing and post-tensioning testing under CSA A23.1, soils, steel, masonry and fireproofing testing, envelope, roof and air leakage testing, field reviews and letters of assurance under the BC Building Code, nonconformances and corrective action, deficiencies, substantial performance and warranties under CCDC 2, and quality metrics and culture, following one wood-frame mid-rise from podium to handover.

Part of the Construction Management stream, typically taken in year 3.